NEWS
20/07/2023
Zhoushan Daily Interviewed Hann-Ocean Energy for its Wave Energy Generation Technology
Recently, Mr. Han Lei, General Manager of Hann-Ocean Energy (Zhoushan) Co., Ltd., was interviewed by Zhoushan Daily and introduced Drakoo wave energy generation technology and its development prospects, etc.
03/07/2023
Hann-Ocean Energy’s Drakoo Wave Energy Generator Continues Generating Electricity Steadily
Hann-Ocean Energy’s Drakoo wave energy generator has been undergoing sea trials for nearly 11 months in Shengsi archipelago. The generator is now under the second round of sea trial after being modified technically and has so far achieved several impressive results.
24/05/2023
Drakoo Wave Energy Generator Unveiled at "2023 East Cliff Forum"
On May 21, 2023, the "2023 East Cliff Forum-Innovative Development of Marine New Energy in Shengsi County" was successfully held in Sijiao Island, hosted by the People's Government of Shengsi County and organized by the Economic and Information Bureau of Shengsi County and Hann-Ocean Energy (Zhoushan) Co., Ltd.
06/05/2023
HANN-OCEAN TECHNOLOGY SUCCESSFULLY SIGNED A CONTRACT WITH PANAUST TO SUPPLY 17 UNITS OF RIGIFLOAT PONTOONS
On 5 May 2023, Hann-Ocean Technology successfully signed a contract with PanAust from Australia to design and build 17 units of RigiFloat containerized modular pontoons to be assembled into a modular ro-ro ferry for the transportation of mining equipment and vehicles.
24/02/2023
Harnessing Wave Energy – Drakoo Started Second Round of Sea Trial
On February 21, 2023, an exciting news came from Shengsi archipelago, that Hann-Ocean Energy's third-generation wave energy generator Drakoo had been successfully launched, officially starting the second round of six-month sea trial.
29/09/2022
A Stunning Floating Platform Assembled in Darwin, Australia
On 22 September 2022, we received a piece of exciting news from our client Polaris Marine Constructions in Darwin, Australia - the RigiFloat® floating platform comprising 42 units of floating modules that they ordered from Hann-Ocean were fully assembled on the water and successfully connected at 3:00 p.m. on the same day.